Installation of a 1,200L general filter with Clack WSH 2″ valve, a 300L Bibloc softener with TM valve, and three chlorine and pH control panels with their corresponding recirculation system. The work was completed in record time—just 5 days. The hotel was set to open the day after completion, and we successfully met the deadline.